Providence, Rhode Island

Solar in Providence, built right.

In-house W-2 crews installing Tier 1 panels and batteries on Providence homes. 320+ local installs already, on Rhode Island Energy service. 47-day average from contract to a working system.

By the numbers

  • Local installs 320+
  • Utility Rhode Island Energy
  • Avg bill $220 / mo
  • Population 190,000
Local context

Solar in Providence,
on Rhode Island Energy service.

Providence is our primary RI hub. Mix of historic single-family on the East Side and multifamily across the city — commercial work meaningful on the small-business side too.

Our crew dispatches from our Bristol, CT office and reaches every Providence ZIP within standard service radius — no third-party crews, no "we will hire local" handoff. 320+ Providence homes already have a Teamsun system on the roof.

We work in East Side, Federal Hill, Mount Pleasant, and Wayland Providence neighborhood — plus the surrounding Cranston, Pawtucket, East Providence area.

East Side Federal Hill Mount Pleasant Wayland

Providence at a glance

  • County Providence
  • Utility Rhode Island Energy
  • Population 190,000
  • Avg bill $220 / mo
  • Teamsun installs 320+
Cranston
Pawtucket
East Providence
Johnston
What we install

Top services
in Providence.

These three see the highest local demand. We install all nine Teamsun services in Providence — see the full list on the services hub.

Our approach

Our process,
refined through
9,000 installs.

Design
01.

Design

A 15-minute call, then a remote or on-site visit. Aurora-based design, panel and battery brand named on the proposal.

Build
02.

Build

Permits filed, utility interconnection submitted, and equipment staged at our Bristol warehouse.

Install
03.

Install

Local crew, local trucks. Most homes finished in 2 – 3 days. Final inspection scheduled before we leave.

Perform
04.

Perform

PTO from your utility, ITC and rebate paperwork filed, and 25 years of local service after the system goes live.

Your incentive stack

Federal, state, and utility
stacked.

On a typical $30K install in Connecticut, the total incentive stack lands between $13,000 and $17,000. We file every form with you.

Federal ITC

30%

Tax credit, claimed in the year of install. Locked through 2032.

CT ESS battery rebate

Up to $7,500

One-time check from CT Green Bank, paid through your installer.

Net metering

Full retail

1:1 offset on what your panels send back to Eversource or UI.

CT property tax exemption

$300 – $700/yr

System value excluded from your assessment. Sales tax also exempt.

What customers say

Trusted by homeowners
who value quality.

“Teamsun was the only crew that walked the roof, named the panel brand, and answered every question without checking with someone. Same lead tech came back a year later when I added a battery.”
Robert P. Homeowner · Glastonbury, CT
“Three of my neighbors had Teamsun, so I called them. The crew was on my street five days after I signed.”
David L. Homeowner · West Hartford, CT
“They knew the historic district secretary by first name. Saved us six weeks on permitting alone.”
The Hwang family Homeowners · Glastonbury, CT
“Same lead tech who installed it came back four years later to swap an inverter under warranty. No charge, no excuses.”
Sandra M. Homeowner · Worcester, MA
Providence FAQ

Questions Providence homeowners ask.

How much does solar cost in Providence?

A typical 8 – 12 kW residential install in Providence runs $25,000 – $40,000 before incentives. After the federal ITC and Rhode Island state programs, effective costs land 40 – 60% lower over the first five years. We model your specific roof in Aurora using Rhode Island Energy rate data.

Does Teamsun install in my Providence neighborhood?

Yes — we work across East Side, Federal Hill, Mount Pleasant, Wayland and surrounding Providence ZIPs. 320+ Providence homes already have a Teamsun system. The crew dispatches from our Bristol, CT office.

How long does the install take in Providence?

47 days on average from signed contract to a working system, including Providence permitting and Rhode Island Energy interconnection. The on-roof portion is 2 – 3 days. We file every form on your behalf.

What incentives can I claim as a Providence homeowner?

Federal ITC (30%), RI Net Metering or Renewable Energy Growth performance program, property tax exempt. Teamsun files every form with you — federal ITC paperwork is handed to your CPA, state and utility paperwork we submit on your behalf as part of the install.

Do you use subcontractors on Providence installs?

No. Every Teamsun install — in Providence and across our entire CT, MA, and RI service area — is done by W-2 employees on our payroll. The lead tech who walks your roof at the site visit is the same lead tech who installs your system.

What if my Providence home has an older roof?

If your roof is over 12 years from end-of-life, we strongly recommend our solar + roofing bundle — re-roof and install solar on the same timeline. Providence's housing stock makes this a common scenario; we have the crew and process for it.

Can I add a battery to existing solar in Providence?

Yes — see our battery retrofit service. RI battery storage programs accept retrofitted batteries on existing solar. Most national installers refuse this work; we built a team around it.

Are you licensed to do work in Providence?

Yes — Teamsun is licensed in Rhode Island (and ME, NH, VT, FL for project work on request). License numbers, NABCEP certification, and BBB profile are all available on every quote and contract.

Free quote

Ready to go solar?
Request a quote today.
It's free.

A 15-minute call with a designer who knows your town. No closer on the line. No follow-up unless you ask for one. $0 down options available.

Bristol office

A person picks up.
Mon – Fri, 8am – 6pm.

Service area

CT · MA · RI
Licensed in ME · NH · VT · FL

Free terms

$0 down, free consult.
No credit card required.