Blog / Solar + Roofing

Solar-Ready Roof Checklist for Homeowners

Use this solar-ready roof checklist to organize covering, deck, attic, shade, structure, attachments, electrical paths, warranties, and bids.

DK

Dan Katzman

Founder, Teamsun

August 10, 2026
Updated August 10, 2026
18 min read

A solar-ready roof checklist prepares a quote; it does not declare a roof structurally safe. Inventory covering records, attic and leak history, roof planes, shade, structural concerns, access, attachments, electrical route, warranties and reroof plans. Require qualified professionals and authorities to decide what ground-level observations cannot.

This guide separates homeowner documents, contractor inspections and professional determinations. Do not climb onto a roof for this worksheet. OSHA identifies roof edges and skylights as serious fall hazards even for trained workers using planned protection (OSHA fall-prevention campaign).

Teamsun offers a solar and roofing project discussion. That service link does not verify Teamsun roofing licenses, inspection methods, attachments, flashing, warranties, crew model, schedule, or results. Apply the same evidence request to Teamsun and every other bidder.

Direct answer: A roof is ready for a final solar proposal only after the roof covering and moisture condition, usable roof zone, structure and design loads, adopted fire/building rules, attachment and water-shedding details, electrical pathway, warranties, sequence, and closeout responsibility have named evidence owners. A homeowner’s visual check is an intake step—not engineering approval.

How should a homeowner use this checklist safely?

Use the checklist to collect facts and questions from safe locations. Do not walk the roof, open energized electrical equipment, cut finishes, disturb suspected mold or hazardous material, move insulation around live wiring, or claim that a rafter, truss, deck, service, or attachment is adequate.

The U.S. Department of Energy says a solar installer, roofing expert, or structural engineer can help determine roof suitability, and suggests using permit records when the installation or replacement date is unknown (DOE consumer solar process). Treat those roles as complementary:

Information typeHomeowner can prepareProfessional must return
RecordsPermits, invoices, warranty, repair/leak log, home inspection, insurance claimsAuthenticity/relevance review; missing-record implications
ExteriorGround-level photos of each elevation, gutters, visible covering, roof features, nearby treesClose inspection, material condition, drainage, repair scope, safe access plan
InteriorPhotos from an safely accessible attic floor or hatch; dates/locations of stains, odors, dampnessMoisture-source diagnosis, deck/framing condition, remediation or repair scope
GeometryRough sketch of planes, ridges, valleys, hips, dormers, skylights, chimneys and ventsField dimensions, slope, usable solar zones, adopted setbacks and access paths
StructureKnown additions, alterations, damage, unusual loads, available drawingsDesign loads, member/span/connection analysis, reinforcement need and sealed documents where required
Solar designBills, future loads, aesthetic preferences, shade observationsProduction model, layout, racking/attachment design, wind/snow/load checks
ElectricalPhotos of closed panel/service/meter equipment and labels; known upgradesCapacity, condition, connection method, route, disconnects, code/utility compliance

Label every worksheet field documented, homeowner observation, bidder assumption, or professional determination. That simple label prevents a sales proposal from turning “no stain seen from the hatch” into “roof passed inspection.”

What roof records should you collect before requesting quotes?

Start with evidence of what the roof actually is. Age is not condition, a warranty term is not remaining service life, and a home listing is not an as-built record.

Complete this record sheet:

RecordWhat to enter or attachIf unavailable
CoveringAsphalt shingle, standing-seam/other metal, slate, tile, wood, membrane, built-up, or unknownPhotograph from the ground; mark unverified
Installation datePermit, contract, paid invoice, closing file, or prior-owner recordAsk municipal records office; do not estimate from appearance
ProductManufacturer, line, model, color, batch/lot if presentAsk roofer to identify what can and cannot be confirmed
Layers/assemblyKnown tear-off, overlay, underlayment, deck/sheathing and insulation historyMark concealed; require investigation/change process
WarrantyFull terms, registration, contractor, transfer status, exclusionsAsk issuer in writing before solar work
RepairsDate, location, reason, contractor, photos, invoice, leak outcomeCreate a roof-plane repair map from memory and documents
Claims/eventsWind, hail, ice, tree impact, fire, water, structural, or insurance recordState “none known,” not “none”
AlterationsDormer, addition, chimney, skylight, vent, HVAC, antenna, reroof, insulationMatch additions to permits/drawings where possible
Prior opinionsHome inspection, roofer report, engineer letter, drone or thermal reportRecord scope and date; do not treat it as permanent approval

Different roof coverings and assemblies require different access, attachments, flashing or clamps, walking precautions, replacement materials, and warranty coordination. Do not label one material universally “solar compatible.” Ask the bidder to name the exact assembly it believes is present, the exact mounting approach, the document supporting that approach, and what field finding would change it.

DOE tells buyers to ask whether roof repair is needed, who is responsible for damage or leaks, and whether relevant vent relocation belongs in the proposal (DOE choosing a solar installer). This checklist stops before deciding whether replacement is timely. Do not turn generic age or cost ranges into an address-specific conclusion.

What can you observe from the ground and attic without declaring the roof ready?

Record symptoms, locations, dates, and weather—not diagnoses. A stain might reflect an old repaired leak, active flashing failure, condensation, ice damming, plumbing, or another source. A clean-looking attic area does not reveal every concealed deck, underlayment, or framing condition.

Safe exterior observation sheet

From the ground or an accessible window, record:

  • roof planes that appear uneven, wavy, sagged, or changed near an addition;
  • missing, displaced, cracked, curled, corroded, patched, or visibly different covering areas;
  • debris, vegetation, ponding evidence, damaged gutters, displaced flashing, or drainage concerns;
  • chimneys, masonry, skylights, plumbing vents, exhausts, antennas, snow guards, rooftop equipment, and overhead conductors;
  • branches touching or overhanging the roof and shade at several safe observation times;
  • exterior penetrations, conduit possibilities, service/meter location, and vehicle or ladder-access constraints; and
  • steep drops, narrow side yards, decks, conservatories, pools, landscaping, or utility equipment that may affect safe staging.

Date ground-level photos and mark the elevation. Drone imagery does not replace safe operation or hands-on inspection.

Safe interior/attic observation sheet

Only from an area you can enter safely without walking on drywall, moving wiring, or disturbing materials, record:

ObservationNote and photographProfessional question
Stains or damp areasExact location, apparent size, date, weather, whether changingIs the source active, historic, roof-related, or condensation?
Musty odor or visible growthLocation and extent; do not disturbWhat moisture and indoor-environment professional is needed?
Wet, compressed, missing or displaced insulationLocation and known historyIs water, air leakage, ventilation or another source involved?
Darkened, delaminated, warped or soft-looking deckLocation; no probingWhat close inspection or testing is justified?
Split, cut, drilled, altered or sistered framingMember/location and nearby alterationDoes an engineer need to evaluate capacity or load path?
Rust, daylight, failed seal, or staining at penetrationsWhich chimney/vent/fastener areaWhich trade owns repair and flashing?
Exhaust terminating in atticAppliance/room if knownDoes a qualified contractor need to correct termination?
Limited accessHatch size, stored items, finished ceilingsWhat investigation remains and who restores finishes?

DOE’s durable-attic guidance identifies wet insulation, mold/mildew, warped or rotting wood, worn roof edges, and improperly terminated vents as possible moisture concerns—not a homeowner diagnosis (DOE Guide to Durable Attics). The EPA emphasizes that moisture sources must be corrected and that hidden mold investigation may require caution and professional help (EPA mold and moisture guide).

If water is actively entering, material is falling, the roof visibly changes shape, electrical equipment is wet, or occupants may be exposed to unsafe conditions, stop the solar-quote exercise and route the immediate safety/leak issue appropriately. The roof-leak inspection guide owns post-install leak triage; this checklist merely records preexisting conditions.

How do geometry, obstructions, shade, and access define the usable roof planes?

Total roof area is not usable solar area. Ridges, hips, valleys, dormers, skylights, chimneys, vents, setbacks, firefighter pathways, attachment zones, shade, snow/drainage behavior, module dimensions, and safe worker access can divide a large roof into small or unsuitable pieces.

Make a simple plane inventory without estimating panel count:

Plane IDDirection and approximate slopeCovering/conditionFeatures and edgesShade source/timeBidder-return field
A____________Field dimensions; code-clear usable area
B____________Layout options and excluded strips
C/addition____________Separate structure/age confirmation
Garage/outbuilding____________Ownership, service route and structural review

DOE notes that roof size, shape, slope, orientation, tree shade, and other obstructions change rooftop suitability (DOE Homeowner’s Guide to Solar). Its solar-ready guidance also treats an obstruction-free reserved zone, documented structural loads, a conduit pathway, and electrical-panel space as separate readiness items (DOE Efficient New Homes PV-ready resources). Those new-construction program criteria are not a pass/fail rule for an existing New England home. They are a useful reminder that “sunny roof” covers only one category.

Ask each bidder to overlay modules, attachments, access paths, clearances, vents and service zones on one dimensioned drawing. The return should distinguish:

  • code/AHJ exclusion: required by the edition and interpretation applicable to the permit;
  • manufacturer/racking exclusion: required by listing or installation instructions;
  • construction/service exclusion: needed for attachment, drainage, snow, repair, or safe access; and
  • design choice: selected for production, aesthetics, future expansion, or cost.

Shade needs an annual model, not a noon photo. Ask for its data source, obstruction assumptions, tree-work responsibility, and confirmation that production inputs match the final layout.

Who decides structural, snow, wind, fire, and access readiness?

Responsible professionals and authorities make those determinations. A salesperson, satellite image, checklist, or module weight alone cannot prove that the roof, deck, framing, connections and load path support the proposed array and environmental loads.

Flag—not diagnose—conditions such as:

  • visible sagging, movement, cracks, fire/water/pest damage, or altered framing;
  • additions, converted spaces, multiple covering layers, or missing plans;
  • long spans, unusual framing, altered trusses, or concentrated rooftop loads;
  • snow drifting, ice dams, high-wind exposure, or roof-edge damage;
  • assemblies requiring specialized access or design; and
  • any discrepancy between field conditions and permit/property drawings.

DOE’s current PV installation lifecycle guidance separates structural/site design, electrical equipment, racking, fasteners, commissioning, and system-type-specific considerations (DOE install and commission a PV system). Require the bidder to say who performs each check, which design loads and code edition apply, what field data they use, whether an engineer is required, and what signed/sealed or permit document you receive.

Current-code routing in CT, MA, and RI

As of August 10, 2026, do not copy a universal internet setback or structural rule into your worksheet:

StateCurrent official routingBuyer action
ConnecticutDAS says the planned 2026 codes were delayed pending legislative review; its regulations page still identifies the 2022 Connecticut State Building Code for current permits (CT adoption status, CT current code)Ask the local official which code, fire provisions, forms and interpretations apply on filing date
MassachusettsThe 10th Edition based on modified 2021 I-Codes is the current statewide building code after the concurrency period ended (Massachusetts 10th Edition)Confirm local permit, fire/access, structural and electrical review for the exact home
Rhode IslandThe Building Code Commission says 2021 ICC codes with Rhode Island amendments took effect December 1, 2025 (RI laws, rules and regulations)Read the incorporated model code and RI amendments together; verify municipal/AHJ requirements

DOE explains that local governments’ rooftop-solar permit and inspection requirements differ (DOE permitting and inspection). A permit review is not a roof warranty or guarantee of future performance; it is one required authority gate.

What attachment, flashing, drainage, and roof-warranty answers belong in the quote?

Require an attachment narrative for the actual roof assembly, not “standard mounting.” It should explain how loads reach approved structure, how the weather-resistive layers continue to shed water, how missed framing or damaged covering is handled, and who restores the roof.

Use this bidder-return table:

Attachment fieldRequired written answer
Existing assemblyCovering, underlayment/membrane, deck, framing and any unverified layer
Racking/mountExact manufacturer/model or defined performance specification; approved roof types/slopes
Structural connectionIntended member, locator/verification method, fastener and design basis
Water managementFlashing/seal component and integration with covering/underlayment; drainage and ice/snow response
Errors/field variationProcedure for missed framing, split member, cracked tile/slate, damaged seam/membrane, stripped fastener, or concealed deterioration
Roof transitionsValley, ridge, hip, eave, wall, chimney, skylight, vent and addition interfaces
Construction evidencePre-work photos, concealed-work/attachment photos, torque or installation records where applicable, final roof review
ResponsibilityRoofing lead, solar lead, inspection owner, repair decision path, access/removal cost rule
Warranty alignmentRoof issuer’s written conditions, solar workmanship/penetration terms, exclusions, labor, transfer and claim route

DOE’s Building Science Education resource explains that roof penetrations are vulnerable to water intrusion and flashing must integrate with the water-shedding assembly (DOE Building Science: water-managed roofs). That source illustrates the principle; the roofing manufacturer, racking instructions, adopted code, designer, roofer and project conditions control the detail.

Never accept “solar does not void roof warranties” or “any penetration voids the warranty” as a universal answer. Send the proposed attachment and installer information to the current roof warranty issuer. Ask whether coverage remains, what inspections or approved contractors/materials are required, who registers the work, and what is excluded. Keep the written response.

The contract should define leak response, investigation, access, panel removal/reinstallation, restoration, claim assistance and transfer. It should not predetermine fault without inspection.

What electrical pathway and equipment facts should be ready before final layout?

Roof readiness includes a viable electrical route from array to inverter or combiner, required disconnects and equipment, service/panel, meter and utility point. A spare breaker position alone does not prove capacity or compliance. Do not remove a panel cover; photograph only closed, safely accessible equipment and labels.

Prepare:

  • service and meter location plus ground-level route photos;
  • closed main/subpanel photos showing visible labels and ratings;
  • known service, panel, generator, battery, EV, HVAC or electrical upgrades;
  • preferred/prohibited equipment locations and finished-space constraints;
  • underground utilities or landscaping affecting a ground route; and
  • planned batteries, EVs, heat pumps, additions, reroofing, or service changes.

Require the bidder to return this sequence:

array/rapid shutdown → roof transition → inverter/combiner → disconnect/metering → service/panel → utility point

For each arrow, request the route, equipment, conductor/raceway concept, penetration/firestopping/weatherproofing scope, accessibility, owner-visible finish, and who restores walls/roof. Ask what changes if the preferred route is not feasible.

DOE’s homebuilder guidance says solar planning includes both roof structural support and electrical-panel/wiring considerations (DOE Solar Energy Guide for Homebuilders). Existing-home feasibility still requires the responsible electrician, utility, equipment instructions, local code and permit review. B186 records the pathway; it does not design it.

Should you roof now, install solar now, combine the work, or defer?

Choose only after evidence replaces the unknowns. There is no universal roof-age cutoff. Material, installation, exposure, repairs, moisture, structure, warranty, attachment, ownership horizon and professional judgment all matter.

Use this decision tree:

  1. Is there an active leak, unsafe condition, unresolved moisture source, visible deformation, or damaged framing? Stop solar scope and route the condition to the appropriate professional.
  2. Can the roof assembly, installation/repair history, warranty, and condition be documented well enough for a roofer to give a remaining-service recommendation? If no, obtain that assessment before final solar pricing.
  3. Does the responsible roofer conclude the existing roof can reasonably remain while accepting the proposed solar attachment and service plan? If yes, price solar now with written limitations.
  4. Does the roof need planned replacement independent of solar, while the solar project remains feasible? Price roof now, then solar, or a coordinated combined project using the same final layout and responsibility matrix.
  5. Can separate contractors coordinate attachments, sequence, warranties, and first response in writing? If yes, a split structure may work. If no, compare a prime combined structure or defer.
  6. Do structure, usable area, shade, code/access, electrical route, ownership, or budget remain unresolved? Defer or redesign; consider another plane, detached structure, ground mount, or community-solar option where appropriate.

The decision output should state roof now / solar now / combined / defer, its evidence, unresolved assumptions, reevaluation trigger, and accountable professional. It should not say “passed” based only on age or appearance.

If you want one contractor conversation for the two scopes, send Teamsun this completed roof worksheet. Require Teamsun to fill the same professional and evidence fields before treating the roof as ready.

What should every bidder return before you compare proposals?

A pre-quote worksheet becomes useful when the bidder must reconcile it. Send identical inputs, then require a return schedule that distinguishes preliminary assumptions from post-survey and permit determinations.

Return itemPreliminary quoteBefore contract becomes irreversibleCloseout
Roof record/conditionKnown assembly, records reviewed, visible concerns, missing evidenceRoofer/site findings, repair or reroof scope, concealed-condition processFinal roof material, repairs, photos, warranty registration
Geometry/layoutCandidate planes and rough exclusionsField dimensions, final layout, code/access/setbacks, obstructionsAs-built module and roof-feature plan
StructureAssumptions and red flagsDesign loads, review method, engineer/AHJ documents if requiredApproved/as-built structural/attachment records
Attachments/waterProposed mount/detail familyExact components, location/member verification and warranty acceptanceConcealed-work photos, substitutions, final inspection/punch record
Shade/productionData source and preliminary assumptionsFinal shade/layout/production inputsFinal model and monitoring baseline
Electrical pathCandidate route and known equipmentSite-verified design, permits/utility requirements, restoration scopeAs-built one-line, labels, approvals and equipment records
SequenceRoof/solar responsibility and dependenciesWeather/dry-in, inspections, handoff and change-order planCompleted milestones and unresolved punch items
Warranty/serviceProposed providers and first responseFull terms, exclusions, access/removal, transfer and claim procedureRegistrations and owner-controlled service contacts

Ask each bidder to color-code confirmed, allowance, excluded, owner responsibility, and pending authority/professional decision. Then compare scope before price. B012’s solar and roofing contractor checklist owns legal entities, credentials, insurance and multi-trade provider selection; use it after the roof data room is complete.

How should roof and solar work be sequenced and closed out?

The schedule should protect the building, preserve design control, and prevent solar work from starting on an unaccepted roof. Exact duration depends on project, weather, authority review, hidden conditions, materials and utility; this page provides no Teamsun timeline.

Request these gates:

  1. Records and safe observation: homeowner data room delivered; known leaks/safety issues routed.
  2. Professional site review: roof, attic/access, structure, shade/geometry and electrical conditions documented.
  3. Coordinated design: one roof plan and solar layout; attachment, vent, route and access decisions reconciled.
  4. Contract/change control: concealed conditions, allowances, substitutions, weather protection, roles and owner approvals defined.
  5. Roof work and dry-in: any authorized repair/replacement completed; deck findings and changes photographed; roof lead accepts the solar phase.
  6. Solar attachment/install: exact approved detail used; field deviations documented and resolved before concealment.
  7. Inspection/commissioning: authorities complete applicable reviews; solar and monitoring tested under the contract.
  8. Closeout: as-builts, permits, warranties, registrations, photos, service contacts and punch list transferred.

The closeout folder should include roof product and installer records, repair/deck/attachment photos, final module layout, as-built one-line, exact racking and flashing/attachment models, permits and inspections, approved changes, manufacturer and workmanship warranties, monitoring access, first-service contact, leak investigation procedure, and future panel removal/reinstallation terms.

Do not let the roof and solar records live only in contractor portals. Store an owner-controlled copy and transfer it with the home.

Which findings mean stop, pause, or proceed?

Use the evidence gate before comparing financing or signing a construction commitment.

SignalDecisionRequired next step
Active water entry, unsafe electrical exposure, falling material, visible structural movement, or other immediate hazardSTOPProtect occupants/property and contact the appropriate emergency or qualified professional
Bidder calls the roof structurally ready from imagery, age, module weight, or visual appearance aloneSTOPDemand the project-specific review required by the AHJ/design facts
Covering/assembly, deck, framing, leak source, warranty, code edition, or attachment remains unknownPAUSEAssign an evidence owner and decision deadline before final design
Roof and solar plans use different vents, dimensions, setbacks, or routesPAUSEReconcile one coordinated drawing and change control
Professional recommendations conflictPAUSEAsk each to state scope, evidence and assumptions; obtain independent review if material
Existing roof is professionally accepted for the proposed attachment and service plan; scope and warranties alignPROCEED TO SOLAR COMPARISONRetain written evidence and limitations
Planned roof work and solar design are coordinated with roles, dry-in, handoff and closeoutPROCEED TO COMBINED COMPARISONCompare cash scope, contract, credentials and schedule
Usable area, structure, shade, route, rights, safety or economics remains unsuitableDEFER OR REDESIGNResolve prerequisite or evaluate a different solar pathway

“Proceed” means ready to compare proposals—not permission to build. Contract review, professional design, permits, utility approval and construction quality still remain.

Frequently asked questions about solar-ready roofs

How old can a roof be before solar panels are installed?

There is no universal age. Verify the material, installation and repair records, present condition, moisture/ventilation, warranty, proposed attachment, and a qualified roofer’s project-specific remaining-service recommendation. Two roofs installed the same year can justify different decisions.

Can I tell whether my roof is structurally ready by looking in the attic?

No. Safe observations can flag staining, altered framing, damage or missing records, but they do not calculate dead, snow, wind or other loads; verify members, spans, connections or load path; or replace engineering and AHJ review.

Should I climb onto the roof to take solar quote photos?

No. Provide ground-level and safely accessible interior photos, records, and known history. Ask the bidder to explain its safe access and inspection process. Roof work exposes even trained workers to serious fall hazards.

Do stains in the attic mean the roof must be replaced?

Not necessarily. Record location, size, date, weather and change, then have the source and damage evaluated. A stain can be active, historic, roof-related, condensation-related or from another source. Do not cover or disturb suspected growth before appropriate review.

Can any roof material support solar panels?

Do not use a category-wide answer. The exact covering and assembly, condition, slope, access, mounting/listing, structural design, water management, code, manufacturer rules and available qualified contractors determine feasibility and scope.

How much unshaded roof area do I need?

It depends on the module/layout, energy goal, usable planes, setbacks and access, shade model, structural zones, attachments and electrical design. Ask for a dimensioned layout showing why every excluded and occupied area exists; do not rely on a universal square-foot rule.

Can plumbing vents be moved to make room for panels?

Sometimes, but the responsible roofer, plumber/mechanical contractor, solar designer and code official must approve the exact change. Put relocation, flashing, permit, cost, warranty and responsibility in the coordinated scope.

Does a spare breaker space mean my electrical panel is solar-ready?

No. The responsible electrician and utility must evaluate panel/service condition and ratings, connection method, equipment, conductor route, required disconnects/metering, code and utility rules. A visible empty space answers only one observation.

Will solar attachments void my roof warranty?

Only the current warranty issuer and documents can answer for the proposed work. Send the exact attachment, flashing, installer and roof information to the issuer; request written requirements, registration/inspection steps, exclusions, labor/access terms and transfer rules.

Who decides the required roof setbacks and firefighter access?

The adopted building/fire/electrical rules and local authority having jurisdiction govern the project, together with listed equipment and design requirements. Ask the bidder to cite the applicable edition and show required paths/clearances on the permit layout.

Should the roof and solar use one contractor?

One prime may simplify accountability, while separate qualified specialists may work well with a written interface. Compare legal entities, credentials, design ownership, dry-in handoff, attachments, warranty alignment, first leak response, change orders and closeout—not the number of logos.

What if the roof is not a good solar host?

Resolve repair, structure, shade or layout constraints where justified, or evaluate another plane, detached structure, ground mount, carport or community solar. Deferring rooftop work is rational when a prerequisite remains unsafe, uneconomic or unsupported.

Research method, limitations, and next step

Research was completed August 10, 2026. Exact-intent results commonly used “ideal roof” tables with universal ages, directions, pitches, materials or remaining-life cutoffs. Representative results were Sunrun’s roof-suitability guide, Haven Energy’s roof requirements, and a New England Clean Energy page. They established SERP format, not project facts.

Homeowner discussions focused on uncertain roof age, conflicting solar/roofer opinions, roof areas under the array, vent coordination, later removal/reinstallation, warranties and whether a solar company or roofer should control the work (r/solar Northeast roof discussion, r/solar roof-recommendation discussion). Forum posts informed questions only; their ages, prices, technical statements and recommendations were not treated as evidence.

Primary sources controlled the framework: DOE for consumer routing, solar readiness, roof/vent questions, structural/site/electrical categories and permitting; EPA/DOE for moisture flags; OSHA for fall hazards; and CT, MA and RI agencies for current code-edition routing. The National Renewable Energy Laboratory’s Solar Ready Buildings Planning Guide also informed the separation of roof zone, structure, pathways and documentation. It is planning guidance, not current code or an existing-home approval.

No verified Teamsun roof photos, inspection checklist, roofing licenses, covering or attachment methods, flashing details, engineer/electrician process, warranties, leak procedure, combined price, schedule, crew/subcontractor model, permit record, closeout package, project result or reference was available for B186. None is inferred.

Complete the records, safe-observation, plane, attachment, electrical and responsibility worksheets. Then contact Teamsun to discuss your roof and solar project and require project-specific professional determinations before treating the roof as solar-ready.

Tags: solar ready roof checklistprepare roof for solarroof requirements solar panelsNew England solar
DK

Written by

Dan Katzman

Founder, Teamsun

Teamsun writes practical solar guidance to help property owners compare equipment, project scope, costs, and long-term service before making a decision.

Project consultation

Have a solar project
in mind? Let's talk.

Tell Teamsun about your property, energy goals, and questions. We will help you identify the right next step for the project.

Start with the property

Share the address,
utility, and project goal.

Confirm availability

Teamsun will confirm
coverage for your address.

Match the next step

Solar, storage, roofing,
EV charging, or service.