Blog / Solar Cost

10 kW Solar System Cost in New England

Evaluate a 10 kW solar system cost through exact DC and AC units, roof and electrical limits, load scenarios, financing, storage, and utility rules.

DK

Dan Katzman

Founder, Teamsun

August 10, 2026
Updated August 10, 2026
21 min read

A 10 kW solar system cost is not one regional package price. It is the gross cash cost of an exact, buildable design after its DC module capacity, inverter AC rating, roof and structure, fire access, electrical connection, export treatment, and utility/program path reconcile. The same “10 kW” label can describe different module counts, AC capacities, production models, scopes, and approval routes.

This page covers Teamsun’s verified service scope of Connecticut, Massachusetts, and Rhode Island only. Maine, New Hampshire, and Vermont are outside verified Teamsun coverage. Teamsun offers residential solar installation, but no audited Teamsun 10 kW designs, prices, loads, production, equipment lists, interconnection records, or outcomes were available. Every worksheet below therefore uses blank project inputs or clearly labeled arithmetic.

Direct decision rule: do not buy the rounded size. Buy only after the exact Wdc, kWac, export setting, complete cash scope, interval-load fit, roof/electrical evidence, program unit, and contract revision all describe the same project.

What does “10 kW solar system” mean on a quote?

Usually it means a rounded DC module-nameplate category, but the quote must say. Ten kW could otherwise be misread as module DC capacity, inverter AC output, export limit, program capacity, or a sales label. Those units are not interchangeable.

The exact DC calculation is:

Array kWdc = module quantity × exact module power in watts ÷ 1,000

Current official manufacturer pages illustrate the discrete arithmetic. The Qcells Q.TRON BLK M-G2+ lists 415–440 W power classes, while the REC Alpha Pure-RX reaches 470 W. These are calculation examples, not Teamsun product, inventory, compatibility, warranty, or recommendation claims.

Exact-nameplate builder

Example exact model/power classWhole modulesArithmeticExact DC nameplateHonest description
Qcells Q.TRON BLK M-G2+ 440 W2323 × 44010.12 kWdcRoughly 10 kW; actually above 10.00 kWdc
Qcells Q.TRON BLK M-G2+ 415 W2424 × 4159.96 kWdcRoughly 10 kW; actually below 10.00 kWdc
REC Alpha Pure-RX 470 W2121 × 4709.87 kWdcRoughly 10 kW; actually below 10.00 kWdc
REC Alpha Pure-RX 470 W2222 × 47010.34 kWdcRoughly 10 kW; actually above 10.00 kWdc

Do not choose equipment from that table. The matched design still needs exact voltage/current limits, temperature calculations, string or microinverter mapping, racking, structure, fire classification, code, permit, warranty, availability, and substitution rules. Its purpose is to prevent a rounded label from entering a threshold or price calculation.

Build the project definition card before comparing cost:

RecordContract valueDesign/permit valueUtility/program valueMatch?
Module model × count × watts_________yes / no
Total module capacity___ kWdc___ kWdc___ kWdcyes / no
Inverter model(s) and total rating___ kWac___ kWac___ kWacyes / no
Export control/limit_________yes / no
Equipment revision/date_________yes / no

If any row conflicts, the 10 kW solar price is not ready to compare.

Which threshold and unit should the homeowner verify?

Every size-related rule needs five labels: the authority, exact threshold, unit, measurement point, and effective document. A threshold expressed in inverter-nameplate AC cannot be tested using rounded module DC. A program tier does not automatically control interconnection, building permit, fire access, service equipment, or contract classification.

Threshold and unit register

Decision layerAuthority/sourceExact project inputThreshold/unit in current sourceStatus/evidence
Rounded sales sizeSeller___“10 kW” undefinedreject until defined
Array nameplateModule schedule___ kWdcquantity × exact watts___
Inverter nameplateEquipment schedule___ kWacsum exact continuous AC ratings as applicable___
Export settingUtility-approved controls___ kWutility-defined measurement point___
Connecticut RRESEversource/UI current application and linked program manual___ kWacprogram manual: no more than 25 kW AC by qualified-system inverter nameplateverify current document/application
Massachusetts SMART 3.0 small STGUDOER 2026 materials___ kWacsmall category shown as ≤25 kW ACverify qualification and utility tariff
Rhode Island RE Growth 2026 tierRI Energy 2026 enrollment materials___ kWdcSmall-Scale I >0–15 kW DC; Small-Scale II >15–25 kW DCverify selected path and availability
Interconnection routeServing utility___ DC / AC / exportexact current tariff/application___
Building/fire/electrical reviewLocal AHJ and adopted rulesdesign-specificno universal regional 10 kW threshold assumed___

Connecticut’s current PURA RRES page links the program manual and identifies updated 2026 tariff and fee materials. The linked RRES Program Manual, Version 2024.1, states a qualified-project maximum of 25 kW AC measured by inverter nameplate and treats storage AC separately for program-cap and interconnection purposes. Confirm that the administrator still applies the linked version to the actual 2026 application.

Massachusetts DOER’s SMART 3.0 Program Details labels its 2026 small flat-incentive category ≤25 kW AC. Rhode Island Energy’s 2026 enrollment page labels its two small-scale tiers in kW DC. These examples show unit differences; they do not promise B076 eligibility, a payment, approval, program capacity, or contract value.

The rounded 10 kW label is not itself a universal New England threshold. Preserve all five fields and ask the responsible authority—not a sales representative—to resolve ambiguity.

What does public price data say—and not say—about 10 kW?

Public data can screen arithmetic, but the property quote outranks it. A nationwide marketplace result cannot determine New England roof complexity, exact utility, site work, equipment, financing, storage, survey maturity, or complete installed acceptance point.

EnergySage’s national 10 kW system cost page displayed $25,800 before incentives, updated June 24, 2026, when reviewed August 10. Dividing $25,800 ÷ 10,000 W yields $2.58/W. That is labeled arithmetic from a national marketplace population—not a Teamsun price, CT/MA/RI quote, median, range, fair-price ceiling, or prediction.

Do not multiply $2.58 by an exact design without first checking the source population. Even the denominator changes: the example 23-by-440 W design is 10,120 Wdc, not 10,000. More importantly, a property price requires a current written scope.

Public-versus-project data ladder

RankEvidenceAppropriate useMissing before decision
1Site-verified, current bids for same exact design/scopePrimary price comparisonContract, credit, service and risk review
2Utility/state project data matched by date, ownership, storage and sizeLocal reasonableness screenProperty roof/electrical/site facts
3Public research data matched by geography/year/system typeHistorical contextCurrent project and scope
4Current marketplace state or national pageQuestion triggerComparable population and complete scope
5Search snippet, calculator with hidden inputs, forum quoteDiscover buyer questions onlyNearly every decision input

The New England price-per-watt guide owns normalization across public data and quotes. The 7 kW marginal design guide owns the incremental-step decision. B076’s job is to test exact units and thresholds around the larger residential design.

Can the roof safely and legally fit the exact design?

Panel count or a generic square-feet estimate cannot prove roof fit. Use the exact module dimensions in a measured layout, then apply the local permit, structural, fire-access, attachment, and roof-warranty requirements. No universal roof area applies to all 10 kW systems.

The FTC’s home solar buying guide says output depends on roof pitch, age, condition, direction, sunlight, snow, dust, and shade, and tells buyers to obtain the full installed scope. For a larger multi-plane array, each plane needs its own evidence.

Roof, structure, and fire-access hold points

Hold pointEvidence neededGreenPauseStop on current design
Roof measurementsField-checked planes/obstaclesExact modules fitRemote layout awaits surveyCount cannot fit measured planes
Covering/conditionRoof records and qualified inspectionRemaining plan alignsRepair scope/pricing pendingKnown unsuitable roof ignored
StructureFraming/site data and engineering when requiredDesign basis resolvedEngineer request openReinforcement conflict hidden
Fire access/setbacksAHJ/permit-basis layoutRequired access preservedLocal interpretation pendingModules occupy required access
Attachment/weatherAssembly and attachment detailsCompatible written designDetail/substrate unknownGeneric attachment conflicts
Drainage/snow/serviceValleys, drains, snow paths, accessClear and maintainableOne area unresolvedCritical path obstructed
Roof/PV warrantyWritten responsibilitiesPenetration/service rules clearContractor interface pendingConflicting warranties unaddressed

Raw module rectangle area is only quantity × exact module length × exact module width. It excludes gaps, module orientation, roof edges, ridges, valleys, obstructions, setbacks, pathways, racking, measurement tolerance, attachment zones, and unusable shapes. Do not publish or accept a universal “10 kW needs ___ square feet” claim.

Multi-plane capacity can also weaken energy quality. Record azimuth, tilt, shade, snow/soiling assumptions, and mismatch for each plane. If the last modules occupy a poor plane, compare a smaller high-quality design rather than forcing a label.

How do inverter AC, service equipment, and export limits affect 10 kW?

A 10 kWdc module array does not establish a 10 kWac inverter or a 10 kW export right. The design must reconcile exact inverter rating, DC-to-AC ratio, clipping, branch/string mapping, service connection, panel and service capacity, protection, utility equipment, and any export control.

NREL’s current PVWatts V8 documentation treats system DC capacity, DC-to-AC ratio, inverter efficiency, orientation, losses, and AC energy as separate inputs or outputs. Use that same separation in the proposal.

Electrical and export evidence sheet

FieldExact proposal valueEvidence ownerHold point
Array capacity___ kWdcdesignerModule schedule reconciles
Inverter(s)model ___ / ___ kWacdesigner/manufacturerExact continuous rating and limits checked
DC-to-AC ratio___production designerModeled clipping disclosed
Service/panel basis___ A / ___electrician/utilityConnection method and equipment accepted
PV connection/protection___engineer/electrician/AHJPermit basis resolved
Transformer/secondary___utilityStudy/upgrade/export condition resolved
Export setting___ kW at ___ pointutility/control designerApproved control and fail-safe documented
Production under limit___ kWhmodel ownerCurtailment/export assumption shown
Interconnection statusdraft / study / agreement / authorizedutilityWritten authorization for final design

Do not apply a generic service-panel rule or assume a standard upgrade cost. Existing equipment, connection method, adopted code, utility tariff, protection requirements, and local interpretation matter. Treat major service, panel, transformer, trench, relay, control, and metering work as separate known, allowance, or unresolved project rows.

Clipping is not automatically a design failure. More DC than AC can increase energy outside peak conditions while clipping some peak production. The buyer needs the modeled annual result and exact equipment limits—not a judgment based on label size alone.

If you have a design, bill interval file, and electrical photographs, ask Teamsun for a property-specific 10 kW design and cost review. Teamsun must still verify field conditions, utility requirements, equipment and written scope.

Does the existing and future load support roughly 10 kW?

No universal household consumption justifies 10 kW. Build a current-load case from at least 12 consecutive bills and interval data when available. Then add EV, heat-pump, water-heating, cooking, dryer, addition, or occupancy changes only in separately documented future cases.

Existing and future load cases

Load inputExisting caseCommitted future caseOptional sensitivityEvidence/date
Reconciled annual billed use___ kWh___ kWh___ kWhBills ___
Interval/daytime profile_________Utility file ___
Efficiency changes___ kWh___ kWh___ kWhScope/model ___
EV charging$0 / ___ kWh___ kWh___ kWhMiles, efficiency, schedule ___
Heat-pump space conditioning$0 / ___ kWh___ kWh___ kWhEquipment/design ___
Heat-pump water heater$0 / ___ kWh___ kWh___ kWhEquipment/use ___
Other electrification/addition$0 / ___ kWh___ kWh___ kWhScope/timing ___
Net annual load___ kWh___ kWh___ kWhOwner/modeler ___

The $0 entries mean “not included in this case,” not zero real-world consumption. Never insert a generic EV or heat-pump allowance. Use actual miles and charging efficiency, equipment design and climate assumptions, operating schedules, occupancy, and commissioning date.

Compare time as well as annual totals:

  • Self-consumption: solar energy used behind the meter when produced.
  • Export: energy sent to the grid under current utility/program treatment.
  • Grid import: energy still purchased because production and use do not align.
  • Curtailment: otherwise available production limited by control or utility condition.
  • Seasonal mismatch: summer export does not automatically serve winter heating load one-for-one.

Run a flat-rate sensitivity and a lower-export-value sensitivity. Do not promise bill elimination, annual output, savings, or payback. Fixed charges, rates, load timing, weather, system availability, program rules, financing, and ownership remain separate.

Is storage part of a 10 kW solar system?

No. Storage is a separate energy, power, control, resilience, interconnection, and cost design. A 10 kW PV label does not specify battery kWh, continuous or peak kW, supported motor starts, protected loads, outage duration, solar recharge, reserve, or generator compatibility.

DOE’s Homeowner’s Guide to Solar explains that storage can shift solar energy to later use and may supply energy during an outage. Its older tax discussion is not used here; current tax treatment comes only from the 2026 IRS source below.

Solar-plus-storage separation ledger

Storage fieldRequired project input
Purposebill timing / backup / export control / other ___
Usable energy___ kWh under stated conditions
Continuous / peak output___ kW / ___ kW for ___ duration
120/240 V and motor-start needs___
Protected loads and load management___
Outage reserve and recharge assumptions___
Islanding/gateway/control equipment___
PV-to-storage operating architecture___
Storage inverter AC in threshold/interconnection review___
Incremental gross cash / loan principal / total payments$___ / $___ / $___
Warranty/throughput/service evidence___

Storage does not create solar output. It can move energy, limit export, or support selected loads, subject to conversion losses and operating constraints. A battery sized only because the PV array is “10 kW” may be too small, too large, or wrong for the actual objective.

Keep the battery out of normalized PV $/W. Add its complete incremental cash scope to total project cash when selected. The Teamsun battery storage service supports a consultation route, not a claim about current brands, system sizes, pricing, compatibility, runtime, or program eligibility.

How should CT, MA, and RI rules enter the design?

First identify address, utility, ownership, exact DC and AC capacities, export configuration, and chosen program. Then apply the current state and utility documents to those exact fields. Do not transfer a threshold, tariff, or application route across states.

CT/MA/RI routing table as of August 10, 2026

StateCurrent starting pointUnit/threshold lessonRequired hold point
ConnecticutPURA RRES; Eversource or UILinked manual states 25 kW AC maximum by qualified-system inverter nameplateCurrent manual/application, sizing, tariff choice, storage treatment, approval
MassachusettsDOER SMART 3.0 plus DPU/utility interconnection2026 small category is ≤25 kW AC; “10 kWdc” does not fill that fieldExact kWac, qualification, tariff, utility, ISA and Authorization to Connect
Rhode IslandRI Energy Net Metering or 2026 RE Growth route2026 RE Growth Small-Scale I is >0–15 kW DC; Tier II is >15–25 kW DCExact kWdc, selected program, capacity availability, interconnection and eligibility

Massachusetts DPU says the system owner needs an Interconnection Service Agreement and subsequent Authorization to Connect before connection (Utility Interconnection in Massachusetts). Rhode Island’s thresholds above come from the approved 2026 enrollment page and do not establish that RE Growth is preferable to or stackable with another path. Connecticut’s 2026 PURA page points buyers to current administrators; the older linked manual’s exact unit should be reconfirmed on the live application.

Create an application snapshot containing source URL, document title/version, accessed date, exact threshold language, DC/AC/export field, applicant, responsible administrator, status, and final resolution. Enter conditional program value as $0 in the base case until eligibility, rate, term, recipient, REC ownership, and timing are documented.

What belongs in the cash, loan, and storage cost ledger?

Separate gross cash PV from roof, electrical, site, storage, financing, tax, and state/utility cash flows. The complete budget includes required adjacent work, but a blended number prevents accurate PV $/W and hides threshold-driven costs.

Cash, loan, storage, and cash-flow ledger

Cost fieldPV purchaseStorage add-onComplete project
Exact capacity___ Wdc / ___ kWac___ kWh / ___ kWn/a
Gross cash installed scope$___$___$___
Roof workseparate $___separate $___$___
Electrical/service/utility workseparate $___separate $___$___
Site/structural/permit workseparate $___separate $___$___
Comparable PV $/Wdc$___n/an/a
Loan principal$___$___$___
APR / finance charge / total payments___ / $___ / $______$___
New-2026 homeowner §25D$0$0$0
State/utility valueconditional $___conditional $___separate cash-flow schedule

The IRS Residential Clean Energy Credit page, reviewed July 4, 2026, says Section 25D is unavailable for property placed in service after December 31, 2025. A new 2026 homeowner PV or battery project therefore uses $0 in that row. A qualified tax professional should review properly eligible earlier expenditures, carryforwards, business use, or unusual ownership facts.

Request the same-scope cash price even when financing. Amount financed can differ from cash price, and total payments add the time and credit cost. Teamsun’s financing service does not establish a current lender, APR, dealer fee, approval, term, payment, or savings result. Use the post-credit ownership and financing normalizer before comparing cash, loan, lease, or PPA.

State payments, tariffs, bill credits, RECs, export value, and tax items are not installer discounts unless a governing document says so. Record each separately with owner, eligibility, formula, term, tax treatment, payment timing, and fallback.

How should two “10 kW” proposals be compared?

Make bidders use one property data packet and one evidence boundary. Compare current site-verified revisions, not a remote preliminary layout against an engineered design. The acceptance point should include the same milestones through inspection, utility authorization, commissioning, monitoring, and closeout.

Same-label proposal normalizer

FieldProposal AProposal B
Revision/date/site survey______
Module exact model × count × watts______
Exact kWdc______
Inverter exact model / total kWac______
DC-to-AC / clipping / export______
Roof planes/fire/structure status______
Electrical/service/utility status______
Current/future load case______
Modeled annual/hourly energy inputs______
Gross cash PV$___$___
Roof/electrical/site/storage$___ / ___$___ / ___
Loan principal / total payments$___ / $___$___ / $___
State/program path and unit______
Acceptance point / open changes______

For each unknown, record the trigger, decision-maker, evidence, price method, customer approval right, design effect, deadline, and cancellation or redesign consequence. “As needed” is not a usable allowance.

One proposal can be preferable at a higher cash $/W if it avoids an unsuitable plane, resolves service work, documents export, or carries less change exposure. Conversely, a high-cost proposal does not earn preference merely by including vague engineering language. Evidence, not label size, decides.

When should the buyer stop, pause, or proceed?

Proceed only when exact units, thresholds, complete cash, load fit, roof/electrical design, export, storage, and approvals reconcile. Pause for a defined evidence gap. Stop on the current documents when a material contradiction will not be corrected.

Stop on the current proposal

  • Module count and exact watts do not reconcile to stated Wdc.
  • DC, AC, export, and program size are used interchangeably.
  • The layout ignores field dimensions, structure, fire access, roof condition, or required electrical work.
  • A generic annual output, roof area, household offset, battery size, or program limit is presented as universal.
  • A new-2026 homeowner Section 25D amount is subtracted instead of $0.
  • A public marketplace number or monthly loan payment is represented as the installed cash price.

Pause and resolve

  • Interval load, planned EV/heat-pump use, or export value lacks a source.
  • DC-to-AC ratio, clipping, inverter limits, service connection, transformer, or export setting is open.
  • The current utility/program document uses a different unit from the proposal.
  • Roof, engineering, permit, interconnection, or authorization evidence is pending.
  • Battery purpose, kWh, kW, supported loads, reserve, recharge, controls, or cost is blended into PV.
  • Cash price, principal, finance charge, total payments, and state cash flows do not reconcile.

Proceed to detailed review

  • Contract, design, permit, equipment schedule, model, and application share exact Wdc/kWac and revision.
  • Every threshold has an authority, unit, measurement point, effective document, and written outcome.
  • Measured roof planes, structure, access, attachment, drainage, and warranty interface are resolved.
  • Electrical/service/export conditions and utility acceptance are written.
  • Current, committed, and optional loads are separate and time-aligned with production/export.
  • PV, storage, roof, electrical, site, financing, tax, and program cash-flow rows remain separate.

Proceed means ready for contract, credit, tax, roof, engineering, permit, utility, and program review. It does not guarantee price, production, savings, bill offset, program acceptance, schedule, or resilience.

Frequently asked questions about 10 kW solar system cost

How much does a 10 kW solar system cost in New England?

Only current site-specific CT, MA, or RI quotes can answer. Compare exact Wdc/kWac, gross cash PV, roof, electrical, site, storage, financing, export, and utility/program scope. Public $/W is a dated screen, not a quote.

Does 10 kW mean exactly 10,000 watts?

Not necessarily. Module quantity must be a whole number, so exact DC capacity may sit above or below 10,000 W. Recalculate the schedule and use that exact value in price and threshold tests.

How many panels are in a 10 kW system?

There is no fixed count. Divide target watts by the exact module power, choose a whole-module count, then document resulting Wdc. Module dimensions, availability, roof fit, inverter design, and approvals still matter.

How much roof area does 10 kW require?

No universal area applies. Use exact module dimensions and a measured layout with spacing, orientation, roof geometry, setbacks, fire access, obstructions, structure, attachment, drainage, and local review.

How much electricity will a 10 kW array produce?

There is no universal output. Model the address, weather, roof planes, shade, losses, snow/soiling, exact Wdc, DC-to-AC ratio, clipping, availability, export limit, and curtailment.

Does a 10 kWdc array require a 10 kWac inverter?

Not automatically. Exact architecture, input limits, module behavior, roof planes, clipping, export control, service and utility treatment determine the appropriate AC design. Require a matched schedule and model.

Is 10 kW a universal program threshold?

No. Current examples use different units: CT RRES and MA SMART 3.0 reference AC thresholds, while RI’s 2026 small-scale RE Growth tiers use DC. Verify every actual rule and application.

Is a 10 kW system appropriate for an EV and heat-pump home?

The label cannot answer. Use current bills and interval load plus documented vehicle miles, charging, equipment, climate, efficiency, operating schedule, and installation timing. Show uncertain loads as sensitivities.

Should storage be included in a 10 kW price?

Keep storage separate from PV $/W. Define usable kWh, continuous/peak kW, supported loads, controls, reserve, recharge, islanding, interconnection, warranty, and incremental cash/finance cost.

Can a battery solve an export limit?

It may help under an approved control strategy, but do not assume it will. Compare inverter/control capability, load timing, storage capacity/power, state of charge, losses, fail-safe behavior, and utility approval.

Is there a homeowner federal credit for a new 10 kW system in 2026?

No. Current IRS guidance makes new-2026 residential Section 25D $0 regardless of array size. Obtain tax advice for properly eligible earlier expenditures or carryforwards.

Can a 10 kW system eliminate the electric bill?

Do not assume it can. Grid imports, exports, fixed charges, rate class, production timing, weather, load, program rules, system availability, and financing affect the result. Require a utility-aware bill model.

Sources, research limits, and next step

This guide was researched and updated on August 10, 2026. FTC and DOE material supports property-specific size, roof, shade, storage, bid, and custom-model questions. NREL PVWatts V8 supports separating DC capacity, DC-to-AC ratio, inverter efficiency, loss inputs, and AC energy. Qcells and REC pages support only exact-module arithmetic; Teamsun model support is unverified.

Current PURA, Connecticut RRES manual, Massachusetts DOER/DPU, and Rhode Island Energy sources support the threshold/unit register and routing table. The precise lesson is not that all projects face 25 kW; it is that current sources may measure different decisions in AC, DC, export, or another field. The IRS page supports new-2026 homeowner Section 25D at $0. EnergySage supplies one dated national marketplace arithmetic screen.

The SERP favored generic price, panel-count, output, roof-area, and savings answers. Several results concerned Australia, India, Pakistan, Canada, or the UK and were excluded from New England facts. Homeowner forums informed questions about DIY component cost versus installed scope, batteries blended into PV, service/export limits, and future equipment, but no forum claim became evidence.

No audited Teamsun 10 kW proposal set, module/inverter support list, cash-price distribution, bill or interval-load file, EV/heat-pump model, roof/shade/structural survey, fire-access review, production model, electrical/service/export record, financing disclosure, storage design, CT/MA/RI application, approval, schedule, savings, or completed outcome was available. Blank registers expose those gaps rather than inventing an average.

A defensible 10 kW solar system cost belongs to an exact design whose units and thresholds survive review. Reconcile the documents before using the price.

Get a personalized CT, MA, or RI solar estimate with DC, AC, export, storage, and cost shown separately. Bring bills and interval data, planned loads, roof records, current proposals, equipment schedules, financing disclosures, and utility/program correspondence. Teamsun must confirm service availability, equipment, field conditions, design, production, price, financing, storage, and approvals for the property.

Tags: 10kW solar system cost10 kW solar priceNew England solarsolar system sizing
DK

Written by

Dan Katzman

Founder, Teamsun

Teamsun writes practical solar guidance to help property owners compare equipment, project scope, costs, and long-term service before making a decision.

Project consultation

Have a solar project
in mind? Let's talk.

Tell Teamsun about your property, energy goals, and questions. We will help you identify the right next step for the project.

Start with the property

Share the address,
utility, and project goal.

Confirm availability

Teamsun will confirm
coverage for your address.

Match the next step

Solar, storage, roofing,
EV charging, or service.